Delhi Traffic Advisory: Key East Delhi Stretch to Face Heavy Congestion Until June 30 Due to Drain Maintenance Work
- byManasavi
- 02 Jun, 2026
Residents and daily commuters in East Delhi should prepare for traffic disruptions over the coming weeks as road maintenance activities are expected to impact vehicle movement on a major route in the city. Authorities have issued a detailed traffic advisory warning motorists about possible delays and congestion due to an ongoing drain-cleaning project.
The advisory comes as civic agencies begin an extensive desilting operation aimed at improving drainage infrastructure before the peak monsoon season. While the work is expected to enhance water flow and reduce flooding risks, it may temporarily affect traffic movement in several parts of East Delhi.
Major Road Section to Witness Traffic Restrictions
According to the latest advisory issued by traffic authorities, desilting work on a canal drain is scheduled to continue from June 2 to June 30, 2026. The project covers the stretch between Shastri Nagar and Khureji Red Light via L.M. Bandh Road.
As part of the maintenance operation, one carriageway leading towards the Geeta Colony side is expected to remain unavailable for regular traffic movement. This temporary restriction may significantly increase congestion during busy travel hours.
Authorities have advised commuters to remain alert and plan their journeys accordingly.
Peak-Hour Traffic Expected to Be Heavily Affected
Traffic officials anticipate the highest impact during morning and evening rush hours when office-goers, students, and commercial vehicles use the corridor in large numbers.
Motorists traveling through the affected route may experience:
- Slow-moving traffic
- Longer travel times
- Temporary diversions
- Increased pressure on nearby roads
- Intermittent bottlenecks during peak periods
Experts believe that surrounding routes could also witness additional traffic load as vehicles seek alternate paths.
Why Is the Work Being Carried Out?
The ongoing operation is part of a pre-monsoon maintenance drive designed to clean accumulated silt, debris, and waste from drainage channels.
Regular desilting helps improve water flow and reduces the possibility of waterlogging during heavy rainfall. Civic authorities conduct such operations annually to strengthen urban drainage systems and minimize flooding-related disruptions.
Officials say that although the maintenance activity may cause short-term inconvenience, it is expected to provide long-term benefits by improving drainage efficiency across the area.
Important Advice for Daily Commuters
Travelers using East Delhi roads have been urged to make necessary adjustments to their schedules throughout the maintenance period.
Authorities recommend:
- Leaving home earlier than usual
- Checking traffic updates before starting a journey
- Using alternative routes whenever possible
- Avoiding unnecessary stops near work zones
- Following lane discipline
- Driving carefully around construction areas
Motorists have also been advised to remain patient and cooperate with traffic personnel deployed on the affected stretch.
Safety Measures for Drivers
Traffic police have emphasized the importance of responsible driving near maintenance zones. Since workers and equipment will remain active throughout the project period, drivers should maintain reduced speeds and stay alert.
Officials have specifically advised motorists to:
- Follow diversion signs
- Respect barricades and temporary lane closures
- Avoid overtaking in restricted areas
- Watch for construction workers and machinery
- Maintain safe distances from other vehicles
These precautions can help ensure smoother traffic flow and prevent accidents.
Real-Time Traffic Information Available
Commuters seeking the latest updates can access official traffic information through authorized channels.
Real-time alerts regarding diversions, congestion levels, and route changes are expected to be shared through official traffic communication platforms. Travelers are encouraged to rely only on verified information and avoid unconfirmed social media reports.
Those planning trips through East Delhi during June should monitor traffic conditions regularly to avoid unexpected delays.
Plan Ahead to Avoid Delays
With maintenance work scheduled to continue until the end of the month, daily commuters may need to adjust their travel plans for several weeks.
Anyone using the Shastri Nagar–Khureji corridor should factor additional travel time into their schedules. Early planning, route flexibility, and regular traffic monitoring can help minimize inconvenience during the ongoing infrastructure work.
While the project may temporarily slow movement across parts of East Delhi, authorities believe the improvements will contribute to a more efficient drainage network ahead of the monsoon season.





